Introduction

An EV charger is one of the largest loads in a home. The right choice depends on the electrical panel, the grid connection capacity, your driving habits and whether you have or plan solar PV.

Live in an apartment? See "EV and apartment – charging options".

Technical questions – phases, power, cable, voltage drop: see "Technical choice and sizing" below.

Technical choice and sizing

Single-phase or three-phase

SupplyCurrentPower (AC)
Single-phase 230 V16 A / 32 A3.7 kW / 7.4 kW
Three-phase 400 V16 A / 32 A11 kW / 22 kW
  • The car's onboard charger limits the real power. Many models charge on AC single-phase only, or up to 11 kW three-phase – a 22 kW charger will not charge such a car faster.
  • A large single-phase load unbalances the phases. With a single-phase connection the property's power is limited – ERM Zapad's requirements for residential buildings set 13 kW (63 A) as the maximum for a single-phase unit, and meter panels provide space for three-phase meters for garages and parking spaces.
  • Changing from single-phase to three-phase or increasing the contracted power requires a procedure with the DSO. It can be skipped (Art. 7a of Ordinance No. 6) only if the power and the number of phases stay the same.

How much power you need

It follows from your daily mileage and the hours the car is parked at the charger. Illustrative example: 50 km a day at about 18 kWh/100 km needs about 9 kWh – a few hours even at 3.7 kW. That is why 7.4–11 kW is usually enough for overnight charging at home, and 22 kW only makes sense if the car supports it and charging time is short.

Free capacity

  • Check the contracted power (on the bill) and the main breaker.
  • List the loads that run at the same time – heat pump, water heater, induction hob, oven, air conditioners.
  • Measure or estimate the peak demand (for example by logging for a few days or from smart meter data). The difference to the contracted power is what is really free.

Supply cable size

The cross-section depends on current, installation method, ambient temperature, grouping with other cables and length (HD 60364-5-52, Bulgarian Ordinance No. 3 on electrical installations). Indicative copper sizes for short runs:

  • Single-phase 32 A (7.4 kW): often 3×6 mm².
  • Three-phase 16 A (11 kW): often 5×2.5 to 5×4 mm².
  • Three-phase 32 A (22 kW): often 5×6 to 5×10 mm².

These figures are indicative. A designer or qualified electrician calculates the exact size for the specific route.

Voltage drop

HD 60364-5-52 (Annex G) recommends indicative voltage-drop limits in the installation – about 3% for lighting and 5% for other uses when supplied from the public network. Long runs to a garage, street parking or the yard need a larger cross-section. If the voltage at the charger drops too low, the charger or the car reduces the current or stops charging. At the end of long rural lines the voltage is often low even before your installation.

Dynamic charging current management

  • A current sensor on the main supply measures total consumption, and the charger reduces its current when other loads rise. The minimum charging current under IEC 61851-1 is 6 A; adjustment is usually in 1 A steps.
  • PV-surplus charging – the charger follows solar production.
  • 1/3-phase switching – with a small surplus the charger switches to one phase so it can charge at lower power.
  • Several chargers on one supply share the available capacity instead of each being sized for its maximum.

Local conditions

  • Weak rural grid – low voltage and limited capacity.
  • Earthing system TN-C, TN-S/TN-C-S or TT. HD 60364-7-722 requires measures against the hazard of a broken PEN conductor; some chargers have built-in protection.
  • Outdoors – suitable IP rating and IK impact rating, operating temperature range, protection from direct sun.
  • Distance from the panel and the cable route.
  • Internet connection (Wi‑Fi, LAN or mobile) for a smart charger, the app and dynamic management.

Protection

  • A dedicated circuit for each charging point.
  • Its own 30 mA RCD – type B, or type A/F if the charger has built-in 6 mA DC leakage detection.
  • A circuit breaker with a suitable curve, matched to the cable and current.
  • Surge protection (SPD) – especially with overhead lines and outdoor chargers.

Checklist before buying a charger

  • How many phases and how much power does the car's onboard charger accept?
  • What are the property's contracted power and peak demand?
  • Is the supply single-phase or three-phase?
  • How long is the cable route and how will the cable be laid?
  • Do you need dynamic load management or PV charging?
  • Does the charger have built-in 6 mA DC detection and PEN-loss protection?
  • Will it be outdoors – IP, IK, temperature?
  • Is there internet at the location?

Sources: ЕРМ Запад – Захранване на зарядна станция · ЕРМ Запад – Изисквания за ГЕТ в жилищни сгради · Наредба № 6, чл. 7а (ДВ) · БДС HD 60364-7-722 · Valchev Engineering – ДТЗ за зарядна · Bemis – 11 или 22 kW · Kabelkaufhaus – сечение на кабела за wallbox

This section is general information and does not replace a design. The specific solution is prepared by a designer or qualified electrician.

Who it's for

  • Current or future EV owners
  • Homes with PV that want to charge from surplus
  • Properties with limited connection capacity

What we analyse

  • Charger choice and power
  • Single- and three-phase charging
  • Charging from PV surplus
  • Dynamic load management

What we offer

  • Remote consultation based on your data
  • A site visit when needed
  • A written report or technical concept
  • Independent review of quotes (optional)

The consultancy covers analysis, concept and independent assessment. Detailed design, certification and installation work are not included unless explicitly agreed; they are carried out by licensed partners.

How we work

Initial information

A short enquiry, bills, photos and available technical data.

Analysis

Processing the data, constraints and key factors.

Assessment

Comparing options with a technical and economic rationale.

Presenting the result

A report or concept and an online call for your questions.

What you get

  • A charger and power recommendation
  • A solar-surplus charging scheme
  • Panel and connection requirements
  • A total cost of ownership (TCO) comparison if you plan to buy a car

Packages and indicative prices

Frequently asked questions

Can I charge only from solar?

Partly – it depends on PV size, the season and when the car is at home. The concept shows the realistic share.

Do I need a three-phase supply?

Not always. The analysis shows whether single-phase charging is enough for your mileage.

How much does the consultation cost?

The price is set once the scope is clear; see indicative prices on the Services page.

Should I choose a single-phase or three-phase charger?

It depends on the property's supply and the car's onboard charger. With a three-phase supply 11 kW is the common choice; with single-phase up to 7.4 kW, if free capacity allows.

Do I need 22 kW?

Rarely. Many cars do not accept 22 kW AC, and 7.4–11 kW is usually enough for overnight charging. 22 kW also needs more free capacity and a thicker cable.

What is dynamic load management?

A sensor on the main supply monitors total consumption and the charger reduces its current so the contracted power is not exceeded. This often avoids the need to increase the contracted power.

Key topics

EV chargersingle- vs three-phase chargingsolar chargingdynamic load managementTCO

Related services

Apartments

Balcony PV, shared rooftop PV, EV charging, heat pumps and automation – what is possible and what is required.

Learn more →

Solar PV

The right size and configuration for your consumption, not for the supplier's quote.

Learn more →

Energy automation

Your home sends energy where it is most useful – automatically.

Learn more →

Next step

Tell us briefly what you are planning or what you want to improve. We will suggest a suitable package and a clear scope.

Send an enquiry